A photovoltaic power plant is composed of various elements: solar panel arrays, a transformer and delivery station, a fire tank, outdoor fences and traffic lanes.
The minimum surface area necessary to install an agricultural canopy is 4 hectares. For a dynamic shading solution such as a crop shade, livestock shade or shading system for fallow land, the minimum area is 10 hectares. For ground-mounted power plants, you will need a site with a minimum surface area of 5 hectares.
The construction of our agrivoltaic and photovoltaic systems, as well as environmental studies, administrative and legal procedures, the maintenance of structures and their dismantling are fully covered by TSE. There are no investment costs associated with setting up the project for the farmer.
The owner may want to keep the agrivoltaic structure at the end of the lease and thus become the owner. Otherwise, TSE will dismantle the structure at its own expense so that the plot can be rehabilitated. A collection and recycling organization will collect the panels and recycle them.
We prefer piled foundations to support our solar panel arrays. Metal stakes are driven directly into the ground tounder the panels in case of climatic hazards.